Rework the way Java version is set in CSIT jobs
[releng/builder.git] / jjb / l2switch / l2switch-csit-switch.yaml
index 0b162eedaeb2ce617291bd52f157383862554bd2..970751c70cbcb1fecca5056af9c562a5595a2c01 100644 (file)
@@ -1,8 +1,8 @@
 - project:
     name: l2switch-csit-switch
     jobs:
-        - '{project}-csit-1node-cds-{functionality}-{install}-{stream}'
-        - '{project}-csit-verify-{functionality}-{stream}'
+        - '{project}-csit-1node-{functionality}-{install}-{stream}'
+        - '{project}-csit-verify-1node-{functionality}'
 
     # The project name
     project: 'l2switch'
 
     # Project branches
     stream:
-        - master:
+        - boron:
             branch: 'master'
+            jre: 'openjdk8'
+        - beryllium:
+            branch: 'stable/beryllium'
+            jre: 'openjdk7'
         - stable-lithium:
             branch: 'stable/lithium'
+            jre: 'openjdk7'
 
     install:
         - only:
@@ -31,4 +36,3 @@
 
     # Trigger jobs (upstream dependencies)
     trigger-jobs: 'yangtools-distribution-{stream},controller-distribution-{stream},openflowjava-distribution-{stream},openflowplugin-distribution-{stream},l2switch-distribution-{stream}'
-