creating a new test suite to find out maximum number of switches connected
the idea is not to start and stop mininet with different paramentes, but to
add (and remove) switches to the running topology
the other idea is to make that test not as long as the one running from
../../../testplans/openflowplugin-scalability-daily.txt (1.5h). The new suite
has to last much less.
Existing testplans were updated to point on certain files, not the whole directory,
so new robot file can be placed there.
Change-Id: Ifc7c9beb103b87d049f112ac57215705b8364412
Signed-off-by: Peter Gubka <pgubka@cisco.com>