Updated git submodules
authorVratko Polak <vrpolak@cisco.com>
Mon, 1 Aug 2016 11:40:58 +0000 (13:40 +0200)
committerGerrit Code Review <gerrit@opendaylight.org>
Mon, 19 Sep 2016 18:27:59 +0000 (18:27 +0000)
Project: integration/test master b91bdf9d614d0e63206c2046c7e0926702397a07

Added test suites for Scaleup test in 3 node

cluster with varied number of DPNs

Description: In a 3 node cluster initial inventory shard status is
verified, logs set to error in all nodes and following tests are performed.

- Using Bulkomatic API pushed 10K flows to config datastore via
  follower node2

- Config DS write time and Config DS write rate is calculated

- Mininet flow installation write time and rate is calculated

- Oper DS write time and Oper DS write rate is calculated

- Stop Mininet and Delete the flows

- Calculate config DS delete time and rate

- Added steps to Plot graph for rate and time

- Added test plan for sandbox run

- Improve 1 node suite

Change-Id: I4dd0e7e7f6044be787d0904e7a66cb1995263099
Signed-off-by: Sanjib Mohapatra <sanjib.mohapatra@ericsson.com>
Signed-off-by: Luis Gomez <ecelgp@gmail.com>
docs/submodules/integration/test

index bd6c15b1aaac20d1d9903168b8dca690e3ad039d..b91bdf9d614d0e63206c2046c7e0926702397a07 160000 (submodule)
@@ -1 +1 @@
-Subproject commit bd6c15b1aaac20d1d9903168b8dca690e3ad039d
+Subproject commit b91bdf9d614d0e63206c2046c7e0926702397a07